Archive for ‘Bathroom Remodeling’

Master Bathroom Remodel

By WRW, 1 December, 2008, No Comment

Complete remodel of original master bathroom:  Re-layed out floor plan by removing wall between vanity and water closet/shower,whirlpool area. This opened up master bath to feel airy and functional. Removed unused step to whirlpool bath to give customer more floor area and enlarged shower footprint . Custom tiled complete shower/bath area to give this bathroom a warm and comfortable feel.  Updated lighting and added a pocket door to give this master-bath a free flowing design.

Powder Room / Bathroom Remodel

By WRW, 1 December, 2007, No Comment

Replace all fixtures, including toilet, pedestal sink and lighting. Custom tile floor throughout bathroom and hallway and front entry-way.

Complete Bathroom Remodel

By WRW, 1 December, 2007, No Comment

All new fixtures, including toilet, bath tub, shower doors, sink, cabinets and lighting. Custom tile floor and tub/shower area.

Basement Finishing and Bathroom Addition

By WRW, 1 December, 2006, No Comment

Project start to finish, including framing, drywall, ceiling tiles, recessed lighting and carpet. Added bathroom to new basement, including all plumbing including toilet, shower with glass doors, sink, custom ceramic tile work on floor and shower and lighting.

Basement Bathroom

By WRW, 1 December, 2003, No Comment

Built bathroom (studded, drywall, etc.), ceramic tile floor and shower, install toilet and sink.